Fletcher High School Kitchen & Dining Remodel

Kitchen & Dining Remodel Fletcher High School Project Brief The remodel of Fletcher High School's kitchen and dining area was completed in three phases and included the addition of a temporary serving line. The layout of the food court was revised to have multiple eatery options and styles to compete in the ever-changing market. Complete with Grab-and-Go kiosks, multiple serving lines, and numerous Point-of-Sale kiosks, Fletcher High School students have a quick and modern options to enhance their lunch experience. Details Location Neptune Beach, Florida Client Duval County Public Schools [...]

By |April 25th, 2022|Categories: |Tags: |0 Comments

1890 Clay County Courthouse Restoration

Historic Preservation & Restoration 1890 Clay County Courthouse Project Brief The old 1890 Clay County Courthouse is a historic county courthouse in Green Cove Springs, Florida. The two-story brick building was built in 1890 and used until 1973 and is one of only four Florida courthouses built before 1900. Bhide & Hall Architects was tasked with transforming this unused abandoned building into a useful, aesthetically pleasing County building that remains true to its original style which combines Italianate and Second Renaissance design elements, featuring a round-arched entrance. Restoration efforts included the addition of [...]

By |April 22nd, 2022|Categories: , |Tags: , |0 Comments

1894 Clay County Jail Restoration

Historic Preservation & Restoration 1894 Clay County Jail Restoration Project Brief The 1894 Clay County Jail was in use until 1972. It is the second oldest, still standing jail in the state of Florida, with St. Augustine’s Old Jail being the first/oldest. The building was constructed with one-foot-thick brick walls and features sixteen (16) jail cells of various sizes with a Maximum Security wing on the second floor. Bhide & Hall Architects were tasked with the restoration of the abandoned and deteriorating structure. The residential portion of the building was in danger of [...]

By |April 22nd, 2022|Categories: , |Tags: , |0 Comments

Andrew Jackson High Cyber Security Lab Renovation

Cyber Security & Game Design Lab Andrew Jackson High Project Brief Andrew Jackson High School of Advanced Technology in a joint venture with FSCJ paves the way for its students to enter business and technology industries. Remodeling of existing classroom spaces in a 1925 school building into 3 spaces under a continuing contract with Duval County Pubic Schools (DCPS). The development of project scope through analysis of egress compliance for the 3-story historic school. A formalized egress study was presented to DCPS Office of Building Code Enforcement for review prior to the A/E [...]

By |April 21st, 2022|Categories: |Tags: |0 Comments

Northwestern Legends PreK-5 Conversion

Conversion from Middle School to Prek-5 Northwestern Legends Elementary School Project Brief For this project at Northwestern Legends, Bhide & Hall Architects was tasked with converting a middle school into a PreK-5 campus. The existing 36 classrooms plus music and art labs were redesigned to accommodate elementary-age children. Additional interior renovations include: New Entrance Canopy Updated Classroom Restrooms Updated Clinic Administrative Spaces New Ceilings New Lighting New Interior Finishes Our team worked with the Construction Manager to prioritize the scope of work in order to keep the project within the pre-established $2MM budget. The [...]

By |April 21st, 2022|Categories: |Tags: |0 Comments

Fernandina Beach Middle School Campus Renovation

Kitchen Remodel & Campus Renovations Fernandina Beach Middle School Project Brief Bhide & Hall Architects was tasked with updating the kitchen and student cafeteria at Fernandina Beach Middle School. These areas of the school were too small to accommodate the growing student population. Construction occurred during the school year, which required the project team to develop a temporary kitchen in another location in the school, so foodservice and learning were uninterrupted.Additionally, the scope of work included:Replacement of windows and doors throughout the campus.New perimeter fencing with gate controls.New wall/floor finishes in select rooms.Renovation/remodel of existing [...]

By |April 21st, 2022|Categories: |Tags: |0 Comments

Douglas Anderson Classroom Addition & Remodeling

Classroom Additions & Kitchen / Cafeteria Remodel Douglas Anderson School of the Arts Project Brief New Construction of a 55,000 SF freestanding addition to Douglas Anderson School of the Arts. Spaces include 20 classrooms consisting of: 13 General Classrooms 7 Science Labs 1 Metal Lab New Cafeteria & Kitchen Serving Line 5,300 SF Indoor Student Dining 3,000 SF covered outdoor student dining and staff dining. The building is an Enhanced Hurricane Protection Area (hurricane shelter). The new building and portions of the existing school are served by a new air-cooled chilled water system. [...]

By |January 21st, 2022|Categories: |Tags: |0 Comments
Go to Top